Related Links
|
Toxics Cleanup >
Sites >
Wykoff/Eagle Harbor >
Wyckoff Generational Remedy >
Documents
Documents
A site summary has been prepared that provides basic background information to be used for the expert panel workshop.
Key Documents Identified in the Wyckoff Site Summary
- 2009 - Tech Memo on Evaluation of Wyckoff Groundwater Level Data, April–December 2008 - (PDF, 3.4 MB)
- 2007 - Groundwater Conceptual Site Model Update Report for the Former Process Area - (PDF, 10.8 MB)
- 2006 - Thermal Remediation Pilot Study Summary Report Revision 3.0 - (PDF, 22.9 MB)
- 2005 - Engineering Evaluation of Groundwater and Soil Remediation Scenarios - (PDF, 27.3 MB)
- 2004 - Draft Geotechnical Data Report, Boring and Piezometer Installation – Upgradient Cut-off Wall - (PDF, 2.0 MB)*
- 2004 - Draft Groundwater Modeling and Transport Simulations Report - (PDF, 3.4 MB)
- 2000 - Comprehensive Report Wyckoff NAPL Field Exploration - (PDF, 6.0 MB)*
- 2000 - Record of Decision, Soil and Groundwater Operable Units - (PDF, 3.0 MB)
- 1998 - Offshore Field Investigation Report for the Barrier Wall Design Project - (PDF, 18.7 MB)
- 1997 – Remedial Investigation Report - (PDF, 4.2 MB)*
*Appendices are not included with these reports
Expert Panel Presentations
|
Copyright © Washington State Department of Ecology. See http://www.ecy.wa.gov/copyright.html.